top of page

PASO BASIN MODELING  TOOL

SSJWD recently hired GSI Water Solutions to create a three dimensional computer model of the layers of sediments making up the water holding components of the Paso Robles Groundwater Basin.  This model utilizes publicly available data and analysis from the Sky-TEM electromagnetic helicopter survey of the Basin (links to data below). This 3-D tool is not only fascinating, but will be very useful in any future projects and to guide future management actions.  

Hit the play button below or click on this link to view in YouTube:  https://youtu.be/C4F08rJc8ak

(You can expand to full screen view with the button to the lower right.)

GEOLOGIC STUDIES OF THE BASIN

Stanford University

March 2021

MULTI-POINT STATISTICS

METHOD FOR SkyTEM SURVEY

MPS Report Cover Page.jpg

Read MPS Report

SkyTEM Data Report

October 2020

SURVEY: 

PASO ROBLES BASIN

SkyTEM-Draft-Data-Report Cover Page.jpg

Read SkyTEM Report

Ramboll Study

October 2020

HYDROGEOLOCIAL CONCEPTUAL MODEL IN PASO ROBLES

Sky-Tem HCM_Report Cover Page.jpg

Read Ramboll Study

Colgan Report

August 2012

NEOGENE DEFORMATION IN THE SALINIAN BLOCK

2012 Superimposed extension and shortening Cover Page.jpg

SLO COUNTY COMPUTER MODEL UPDATE

Cover Image - County Map.jpg

On August 28, 2012 the Board of Supervisors awarded a contract to Geoscience, Inc. to update the computer model for the Basin. The scope of work for the project included:

  • Updating the model to extend the period covered from 1981-1997 to 1981-2011

  • Refining the perennial (safe) yield for the Basin

  • Assessing the model input parameters that have the greatest effects on the model's simulation results to determine the certainty of model predictions

  • Evaluating the Basin's response to "growth" and "no-growth" scenarios projected over the period 2011 to 2041 (i.e. simulating how water levels would change)

On January 13, 2015, the final report was presented to the Board of Supervisors, and an amendment to the contract to perform additional refinements to the model and conduct additional model runs was approved.

bottom of page